Thank you to everyone who participated in this engagement and shared their thoughts and ideas for the Bethania to Logan Village Rail Trail by completing the 'Help us Design the Trail' survey. The survey was open to community from 31 August to 12 October 2022 and is now closed.
The 10 km rail trail will seamlessly link with Bethania train station and extend through to Logan Village where it will connect with the recently opened (2021) Logan Village to Yarrabilba Rail Trail.
The rail trail will be built within the publicly owned pre-existing rail corridor from Bethania Station Logan Village.
The rail trail will improve our off-road connections and provide the residents of Logan with healthier and greener transport options.
The feedback provided through the survey will help us inform the design of the rail trail.
To view the survey results, see Engagement Summary PDF document and / or Engagement Report PDF document, both of which can also be found on the documents section of this webpage.
Thank you to everyone who participated in this engagement and shared their thoughts and ideas for the Bethania to Logan Village Rail Trail by completing the 'Help us Design the Trail' survey. The survey was open to community from 31 August to 12 October 2022 and is now closed.
The 10 km rail trail will seamlessly link with Bethania train station and extend through to Logan Village where it will connect with the recently opened (2021) Logan Village to Yarrabilba Rail Trail.
The rail trail will be built within the publicly owned pre-existing rail corridor from Bethania Station Logan Village.
The rail trail will improve our off-road connections and provide the residents of Logan with healthier and greener transport options.
The feedback provided through the survey will help us inform the design of the rail trail.
To view the survey results, see Engagement Summary PDF document and / or Engagement Report PDF document, both of which can also be found on the documents section of this webpage.